
Services
Building demolition
Building demolition has been the core of E.J. Vélar since 1999. We take on large projects — buildings up to 1,000 m², hundreds of tonnes of material and professional disposal — with heavy machinery and experience from major demolition work.
Checklist
What needs to be in place
Before demolition starts, method, equipment, permits, disconnections, material handling and worksite safety all need to be assessed.
- Demolition method
- Correct equipment and knowledge
- Material inspection and handling
- Permits and preparation
- Disconnections
- Worksite safety
- Material disposal
Equipment
Machines for demanding conditions
Our fleet handles high-reach and heavy demolition: working height up to 31 metres, attachments weighing up to 2 tonnes — breakers, shears and crushers — and a concrete breaker that takes up to 60 cm of concrete and separates the steel from it.
E.J. Vélar
Send a demolition enquiry
Tell us about the building, location and access.
